A gallery of photos showing the building of Moorbrook Junction in 2016
By May 2017 we had made a lot of progress. Signalling was installed and operational, while members working on the main station area, the town, and the Birchencliffe Branch were all making a difference.
Six months later, and most of the major buildings were completed, the layout was capable of running trains (both DC and DCC) and all signalling was operational. However many landscape details still remained to complete.
Six months later, and most of the major buildings were completed, the layout was capable of running trains (both DC and DCC) and all signalling was operational. However many landscape details still remained to complete.
This was one of the working drawings for Moorbrook. The Birchencliffe branch curves all the way round over the fiddle yard, to terminate above and behind the main circuit.

Moorbrook Station platforms 1 and 2. Platform 3 is the far side of the island, and is where branch trains depart.